Case Study 1 – Oil and Gas
Location: Port Harcourt, Nigeria
Date: 09/28/2013
Service: Export Packing and Break-bulk Shipping
One of our oil & gas clients engaged us to handle the packing and shipment of skids for Slurry tank, 1500sq feet Cartridge vessel, 1100sq feet Recessed Chamber Filter press, Centrifugal Pump, Hose Basket, Suction Hoses, 832 units of 10 Micron 40” pleated polypropylene cartridge bound for Port Harcourt, Nigeria was received and handled with quality and care at our new heavy lift warehouse and packing facility at Houston, Texas.
The skids were loaded using our heavy duty lifting beam and on site mobile crane in a secure area with 15m headroom.
The skids were packed with tailor-made skeleton timber framing using heat treated timber to ISPM15 regulations for International export, the packing was designed to use the existing lifting lugs to keep costs down to our client without compromising quality standards, the plywood cladding is then applied to the timber frame and shipping marks and international symbols are applied using our CAD computer software. This case is now packed and ready for onward shipment to the Nigeria with its 12 month protection guarantee.
All work completed within the 48 hour deadline given with the help of our 24/7 shift team of packers. All our work is carried out to BS1133 standard and goes through our own internal rigorous inspections.